Search This Blog

Monday 31 March 2014

8th and 9th day of filming

Reshoot

I reshot Luis' close up and parts of his mid shot that I was finding difficult to lip sync because towards the beginning of filming he did not know the words that well. Also for some reason a couple of shots from the narrative section have not turned up after importing them so I want to do them wednesday. I am also pleased to say that my digipak is complete. 
Nevertheless on the 8th filming session rob did not turn up so we decided to do it lunch the next day so that he had no reason not to make it as his escuse last time was he couldn't get a lift home. Fair enough he is paying for the privalidge of the school bus but again the communication is slacking I should have taken everyone's number at the beginning of the project. Even though rob forgot his costume the lunch we were filming he turned up and used his physical education kit and my friends jumper to cover logos. Although this was not the mise en scene I wanted I needed to get the filming done and so I even did the shot in the corridor with people there because I wanted to keep the continuity as I thought either my friend would have forgotten the jumper or rob would have forgotten either the PE kit or filming altogether and I could easily edit out the sound later  in post production. Anyway the day rob didn't come I managed to get to my d of e meeting at 5 and remade the VIP tickets which I lost last shooting session. This is the new design as I could not print in colour this time:
I also printed off a sheet of paper saying VIP only on it to hide the sign "drama studio 3" and increase the verismillitude of the project. 

No comments:

Post a Comment